The turnkey charging infrastructure has been installed at SWB's Friesdorf depot and includes ten charging points: two CCS2 plug-in chargers and eight pantograph chargers mounted on a steel traverse system. The pantographs operate in " panto-down " mode, lowering onto the charging rails installed on the bus roofs. The use of mobile concrete foundations makes the structure relatively easy to move and reinstall, offering flexibility for future depot needs.
Footage from inside a faulty Jubilee line train, which became stuck between Westminster and Waterloo stations on Monday night, shows passengers filing out of what witnesses described as "hot and completely packed" carriages. One passenger told the BBC: "For about an hour or more we had no updates at all, not even from the driver, because the power was out."
Turbulence can appear suddenly and isn't always detected by onboard radar systems, so there may not be time for the pilots to put on the seatbelt sign.
Social media videos captured the harrowing scene as terrified passengers, mostly wearing life jackets, leapt into the sea amidst the chaos of flames and smoke emanating from the KM Barcelona 5 ferry.
Flight passengers departing and connecting through Newark Liberty International Airport (EWR) are experiencing significant delays due to staffing shortages and operational disruptions.
"When we touched down, it was so strong that we jumped. The tire at the front of the plane broke. I don't know if the tire hit the left engine, which was where I was sitting. It sparked, and fire started to come out."