The UK has about 1.59GW of currently installed datacentre capacity at just under 190 sites. If we add existing capacity to that which is planned to complete by 2030 and which has planning consent, we get 4.9GW.
AI Armor provides dynamic runtime security and relies on a central policy engine in the Universal Management Suite (UMS) to meet compliance requirements, ensuring that organizations can manage their security effectively.
We are making sure that we have renewable energy powering all of our datacentre footprint. We have 100% renewable power today that is powering all of Azure, and we're very proud to build that base and essentially stimulate renewable energy around the world and in the UK.
Vertiv has announced new configurations of its MegaMod HDX solution, a prefabricated power and liquid cooling infrastructure designed for environments with very high power densities. The solution is intended for applications such as artificial intelligence and high-performance computing and is available in North America and the EMEA region. According to Vertiv, the new variants respond to the rapidly growing demand for computing power and associated cooling capacity in data centers.
Constructing datacenters accounts for 39 percent of their total carbon dioxide emissions, almost as much as operating them, according to an environmental analysis covering the entire lifecycle of a facility. The finding comes from a white paper published by European datacenter operator Data4, which conducted a lifecycle assessment (LCA) of one of its own facilities with the assistance of design and engineering consultants APL Data Center.
A North American manufacturer spent most of 2024 and early 2025 doing what many innovative enterprises did: aggressively standardizing on the public cloud by using data lakes, analytics, CI/CD, and even a good chunk of ERP integration. The board liked the narrative because it sounded like simplification, and simplification sounded like savings. Then generative AI arrived, not as a lab toy but as a mandate. "Put copilots everywhere," leadership said. "Start with maintenance, then procurement, then the call center, then engineering change orders."
This new reality is forcing organizations to undertake careful assessments before making platform decisions for AI. The days when IT leaders could simply sign off on wholesale cloud migrations, confident it was always the most strategic choice, are over. In the age of AI, the optimal approach is usually hybrid. Having openly championed this hybrid path even when it was unpopular, I welcome the growing acceptance of these ideas among decision-makers and industry analysts.