Urban Lining -KN GLOBAL Headquarter / ZAIRA Architects & Engineers
Briefly

The design process for the office building was heavily influenced by the need to reflect the unique values of the client while also offering future versatility in use.
By utilizing the existing terrain, the architects minimized construction costs and time, allowing for a seamless integration into the Cheonho-dong Tool Street area.
A significant elevation difference on the site facilitates strategic underground parking solutions, negating the need for additional excavation in the construction phase.
The concrete lining concept played a crucial role in the design, linking the architectural expression to the client's specialties in underground construction.
Read at ArchDaily
[
|
]