Construction delays bring heavy traffic congestion at LAX
Briefly

LAX announced lane closures for construction work on Century Boulevard on Saturday night, but delays kept the lanes closed through Sunday morning.
The construction was to facilitate work for the Automated People Mover, a driver-less transit system designed to alleviate traffic around the airport in preparation for the 2028 Summer Olympic Games.
Read at Los Angeles Times
[
|
]