This beloved south London lido has reopened after a 4 million makeover
Briefly

Installed so far is new pumping equipment, pipework and a pumphouse, as well as new paving around the pool and pool lining. Eventually, a future project will see the lido get a new entrance, new café, winter clubroom, gender-neutral showers and toilets.
Read at Time Out London
[
add
]
[
|
|
]