#electricity-grid-connection

[ follow ]
Environment
fromIrish Independent
4 hours ago

Planning application lodged for south Mayo wind farm with 160m high turbines

A seven-turbine wind farm is proposed near Claremorris for 10-year permission, generating 31.5MW, with 160m turbines and grid connection to a 110kV line.
[ Load more ]