"Twin Peaks Promenade" New Trails + Overlooks Groundbreaking Ceremony (SF)
Briefly

"Twin Peaks Promenade" New Trails + Overlooks Groundbreaking Ceremony (SF)
"The project will convert the closed eastern stretch of Twin Peaks Boulevard into a new linear park designed for walking, biking, and taking in the views. It includes two parallel trails, a paved, ADA-accessible path, and a softer natural-surface trail for walking and jogging."
"New scenic overlooks, seating areas, bike racks, and updated signage will be part of the improvements. Habitat restoration efforts will protect sensitive areas, including the endangered Mission Blue Butterfly, ensuring ecological balance."
"The promenade is designed to link into larger trail networks, including the Bay Area Ridge Trail and the Creeks to Peaks Trail, enhancing connectivity for outdoor enthusiasts."
San Francisco is set to enhance Twin Peaks with a groundbreaking ceremony on April 29, 2026. The project will transform the eastern stretch of Twin Peaks Boulevard into a linear park featuring two parallel trails, an ADA-accessible path, and a natural-surface trail. New scenic overlooks, seating areas, bike racks, and habitat restoration for the endangered Mission Blue Butterfly are included. The promenade will connect to larger trail networks, improving visitor experience and addressing previous trail conditions. Completion is anticipated in late 2026 or 2027.
Read at Funcheap
Unable to calculate read time
[
|
]