'Optimistic and satisfied.' Outgoing California high-speed rail CEO reflects on tenure
Briefly

"When I walked in the door in 2018, it was hard to know where we were on the 119 miles in construction down here, because so much of it was still not fully designed yet."
"For the whole 119 miles, we need these pieces that are designed to a detail where you can go to construction. So for the entire 119 miles, it turned out to be much slower than anticipated."
Read at Sacramento Bee
[
]
[
|
]