
"Nvidia has plans for a yet another striking pixelated office building in Santa Clara, just minutes from San Jose's vibrant core. The proposed 692,634-square-foot structure at 2300 and 2350 Walsh Avenue draws inspiration from the company's flagship headquarters, adopting a distinctive hexagonal form across three stories. Accompanied by three levels of underground parking and a pedestrian bridge spanning Walsh Avenue to link with an adjacent property, this development underscores the relentless forward momentum of innovation in our region."
"Acquired by Nvidia in May for $123 million, the site currently holds ten buildings set for transformation into a hub of cutting-edge work. This project fits into Nvidia's aggressive 2025 real estate strategy, where the company has invested over $400 million in properties encircling its Santa Clara base. Another filing from May outlines a 324,000-square-foot facility at 2400 Condesa Street, blending offices, labs, and additional parking to fuel research and development."
"With Devcon Construction handling the build and Gensler leading the design, these initiatives promise to inject fresh energy into the local economy, drawing top engineers, researchers, and entrepreneurs who often commute through or settle in San Jose. The architectural review sits with Santa Clara city officials as of early December, hinting at construction that could break ground soon. For San Jose residents and businesses, Nvidia's growth ripples outward like waves from a stone skipped across the Guadalupe River."
Nvidia plans a 692,634-square-foot, three-story hexagonal office at 2300 and 2350 Walsh Avenue in Santa Clara, featuring three levels of underground parking and a pedestrian bridge to an adjacent property. Nvidia acquired the site in May for $123 million and intends to transform ten existing buildings into a high-tech hub. The project is part of a broader 2025 real estate push exceeding $400 million around the company's Santa Clara base, including a separate 324,000-square-foot Condesa Street filing for offices, labs, and parking. Devcon Construction will build and Gensler will design, with an architectural review underway and construction potentially starting soon.
Read at Thesanjoseblog
Unable to calculate read time
Collection
[
|
...
]