The Marine Accident Investigation Branch's report details that the dinghy, named Charlie, was significantly inferior in construction compared to other vessels used for similar crossings, showcasing clear faults leading to its failure. Specific concerns included glue marks indicating issues with handholds and a fabric floor panel improperly installed. Such substandard construction not only contributed to the structural failure but also posed significant risks to the lives of the migrants aboard, highlighting the broader issue of inadequate safety measures for vulnerable individuals making treacherous crossings.
On the night of the incident, distress signals from the migrants went largely unheeded. The first report of the dinghy being in distress was at 1.53am, and the authorities were notified at 2.13am. Tragically, by the time rescue efforts mobilized, structural failure had already occurred around 3am, leading many onboard into the cold waters of the Channel. In a desperate plea captured by a volunteer, migrants communicated a critical situation: water inundating the boat and lack of safety measures for children. This underscores a need for immediate action in emergency response protocols.
#migrant-crisis #maritime-safety #channel-sinking #humanitarian-issues #marine-accident-investigation
Collection
[
|
...
]