Bakerloo Line Extension: Report urges swift action on building the railway
Briefly

Adding to the higher cost of the extension, as it has been delayed, TfL is estimated to face a cost of circa £500 million keeping the existing Bakerloo line fleet operating until the upgrade opens.
Read at ianVisits
[
|
]