
"An order to boil water before drinking continues for some residents of Malibu due to bridge construction work that disrupted a water main, affecting water supply."
"Residents of Malibu are advised to boil water for at least one minute before drinking to prevent potential illness from contaminants in the water system."
"Bottled water distribution is available at two locations in Malibu for affected residents, running from 9 a.m. to 6 p.m. on Thursday and Friday."
"A similar boil order was issued for neighborhoods in Granada Hills and Porter Ranch due to a water service outage caused by repairs at a pump station."
A boil water order is in effect for residents of Malibu following disruptions to a water main during bridge construction at Solstice Creek. Concrete blocked the water line, delaying restoration efforts. Repairs were completed, and testing for contaminants is ongoing. Affected residents west of Corral Road and Solstice Canyon Road are advised to boil water before use to avoid potential illnesses. Meanwhile, bottled water is being distributed at designated locations. Other areas like Granada Hills and Porter Ranch are also under boil orders due to water outages from maintenance work.
 Read at Los Angeles Times
Unable to calculate read time
 Collection 
[
|
 ... 
]