STCP deploys 20 Caetano electric buses (built with CRRC) in Porto as additional 30-unit order is confirmed - Sustainable Bus
Briefly

STCP deploys 20 Caetano electric buses (built with CRRC) in Porto as additional 30-unit order is confirmed - Sustainable Bus
"The buses were ordered in August 2025 and belong to the new platform developed in partnership with Chinese CRRC an presented at Busworld Europe 2025. The delivery represents the latest step in the fleet decarbonisation programme of STCP. Alongside the entry into service of the new vehicles, Caetano confirms that STCP has already placed an additional order for 30 electric buses, scheduled for delivery in the coming months."
"The buses now delivered to STCP correspond to the latest evolution of the Caetano e.CityGold, a 12-metre model with capacity for up to 88 passengers. The vehicles are equipped with 422 kWh batteries. According to the manufacturer, the buses integrate "highly reliable, state-of-the-art components and technologies from CRRC", while Caetano retains full responsibility for vehicle design, specification and system integration."
STCP has started operating 20 new-generation electric buses supplied by CaetanoBus. The buses were ordered in August 2025 and use a new platform developed in partnership with Chinese CRRC and presented at Busworld Europe 2025. Caetano reports that STCP has placed an additional order for 30 electric buses, with deliveries scheduled in the coming months. Once complete, the programme will bring Caetano electric buses in the STCP fleet to 65 units by 2026. The delivered vehicles are the latest evolution of the Caetano e.CityGold, a 12-metre model with capacity for up to 88 passengers and 422 kWh batteries. Caetano retains responsibility for design, specification and system integration.
Read at Sustainable Bus
Unable to calculate read time
[
|
]