
"The MTA's 2025-2029 capital plan aims to address the long-standing Nostrand Junction bottleneck by rerouting tracks to separate local and express trains."
"By implementing this plan, the MTA expects to save over a minute in travel times and to alleviate ongoing system-wide delays."
"While the reconfiguration will improve efficiency, it will also reroute the 3 train away from key local stops, raising the need for discussions about a new local service."
"Construction is set to commence in the latter half of the capital plan, with potential future signal upgrades to enhance system efficiency further."
The MTA's 2025-2029 capital plan focuses on resolving the Nostrand Junction bottleneck, affecting the 2, 3, 4, and 5 subway lines. This plan involves rerouting tracks to separate local from express services, which aims to save over a minute of travel time and decrease delays system-wide. However, this change will also reroute the 3 train away from certain local stops, prompting discussions about possibly introducing a new local service, referred to as the 8 train. Construction is planned for the latter half of the proposed timeline, along with potential future upgrades to signals to improve efficiency further.
Read at Brooklyn Eagle
Unable to calculate read time
Collection
[
|
...
]